Skip to main content
News — In the Media
Published on

Steel framing takes shape for $1.3B Hollywood Burbank Airport revamp

Urbanize LA Article

 

Six months after our last update, steel framing is clearly visible from the runway of Hollywood Burbank Airport, where construction is in full swing for a $1.3-billion replacement terminal.

Under construction since early 2024, the new terminal is rising at the northeast section of the airport and will consist of a 355,000-square-foot building with 14 passenger gates, shops, restaurants, a ticketing lobby, a new TSA checkpoint, and a new baggage claim area.

The design-build team, which includes Corgan, Holder, Pankow, TEC, CannonDesign, and Burns & McDonnell, has conceived a building with a swooping roof canopy that extends into facade of the airport's parking structure. The design has been described as evoking a silver screen in a public plaza.

 

Read More

Media Inquiries

  • media [at] corgan.com (media[at]corgan[dot]com)

Downloads

Contact Us

Collaborate with Corgan

Contact Us

Careers

Shape the Next Built Environment

See Open Positions